 81. Chain survey is recommended when the area is

 (A) Crowded (B) Undulating (C) Simple and fairly level (D) Hilly terrain 


 82. The term used by CAD system for “Rounding corners” is 
 (A) Chamfer (B) Curve (C) Fillet (D) Smooth 


83. GPS stands for
 (A) Global Positioning Style (B) Global Positioning System (C) General Piece System (D) None of these 

 84. The built-up covered area measured at the floor level of the basement of any storey is called 
 (A) Covered area (B) Open space (C) Yard (D) Plinth level 

 85. The height of road is increased by filling the natural ground is called 
 (A) Macadam (B) Embankment (C) Grouted macadam (D) Water bound macadam 

86. The horizontal distance between any two adjacent riser in a stair is called 
 (A) Going or Run (B) Nosing (C) Bull Nose Step (D) None of these 

87. The sloping members supporting the steps of the stair is called 
 (A) Stringer (B) Ballaster (C) Winder (D) Pitch

 88. The end of a sloping roof finished in vertical triangular is called 
 (A) Tipped roof (B) Gable (C) Battens (D) Cleat 

 89. A wall which supports no load other than its own weight is called 
 (A) Load bearing wall (B) Partition wall (C) Parapet wall (D) None of these 

 90. The excavation of foundation is done according to the _____ and depth. 
 (A) Length (B) Width (C) Area (D) Size 

||Important Question Answer For HPSSC Junior Draughtsman Exam Set-9||Important Question Answer For HPSSSB Junior Draughtsman Exam Set-9||


Join Himexam Telegram Group


                                 Join Our Telegram Group :- Himexam


Top Post Ad

Below Post Ad